Spectrum Center
Home of the Charlotte Hornets, host of historic NCAA upsets and NBA All-Star Games.
Spectrum Center is a multi-purpose indoor arena in Charlotte, North Carolina, United States. Located in Uptown, it is owned by the city of Charlotte and operated by its only current tenant, the Charlotte Hornets of the National Basketball Association (NBA). The arena seats 19,444 for NBA games, but can be expanded to 20,200 for college basketball games.
Quick Facts
- Opened
- 2005
- Flyers tenure
- N/A (the Philadelphia Flyers have never played here)
- Stanley cups won on-site
- None (the Flyers' 1974 and 1975 Cups were won at the Spectrum in Philadelphia)
- Location
- Uptown Charlotte, North Carolina
- Type
- Multi-purpose indoor arena
- Demolished
- Still in operation (not demolished)
Lore & Background
The arena opened in October 2005 as Charlotte Bobcats Arena. The name was changed to Time Warner Cable Arena when the naming rights were purchased in 2008. When Charter Communications purchased Time Warner Cable in 2016, the name was again changed to reflect the Spectrum trade name. The arena was originally intended to host the original Hornets franchise in the early 2000s.
The Hornets' arena, Charlotte Coliseum, was considered outdated despite being only 13 years old, primarily owing to the arena only containing eight luxury suites, whereas the Palace of Auburn Hills, which opened the same year as the Coliseum, had 180. In 2001, a non-binding public referendum for an arts package, which included money to build the new uptown arena, was placed on the ballot for voters; it was placed in order to demonstrate what was believed to be widespread public support for new arena construction.
Polls showed the referendum on its way to passage until then-mayor Pat McCrory vetoed a living wage ordinance just days before the referendum. As a result, Helping Empower Local People, a grass-roots organization supporting a living wage, launched a campaign to oppose the arena, arguing that it was immoral for the city to build a new arena when city workers didn't earn enough to make a living. The referendum failed with 43% for building the arena and 57% opposed.
City leaders then devised a way to build a new arena that did not require voter support, but let it be known that they wouldn't consider building it unless then-Hornets' owner George Shinn sold the team. While even the NBA acknowledged that Shinn had alienated fans, NBA officials felt such a statement would anger other team owners. As it turned out, the NBA approved the Hornets' application to move to New Orleans. However, the league promised that the city would get a new team—which became the Bobcats—as part of the deal.
The total cost of the arena to Charlotte and Mecklenburg County was not known, but estimated at $260 million. The construction was approved by the city council, which did not opt to present another referendum to the public. The arena opened as the Charlotte Bobcats Arena on October 21, 2005, costing $265 million. Architects hoped the building would bring the city together, as its location and large outdoor plaza, among other features, would suggest.
Reader's Guide
Renovations: In September 2014, the Charlotte city council agreed to give the Hornets $34 million for arena renovations in preparation for the 2017 NBA All-Star Game. (However, the game was moved to New Orleans because of a controversial HB2 bill, but the Spectrum Center did host the 2019 NBA All-Star Game to make up for it.) On January 24, 2015, the Hornets announced and unveiled images of a new scoreboard to be installed in summer 2016, costing $7 million.
The board's screens measure out at 25' high by 42' wide and 18' high by 31' wide, approximately, making it almost twice the size of the original board and among the NBA's largest. The screens are able to handle 1080p resolution, something unique to the NBA. Two smaller 'underbelly' screens would also be included. In addition, the scoreboard would be able to change colors and have a visible 'hive' motif built-in throughout its design.
It was also announced that four retractable auxiliary scoreboards will be installed in the corners of the upper level and finally, 360° ribbon boards are scheduled to be installed as well. Construction was completed by the start of the 2016–17 NBA season. Also announced were plans for the renovation of the visitors locker room, suites, and other rooms. This marked the first major renovations to the Spectrum Center in its history.
The city proposed a $245 million renovation plan for both the arena and the area around it in early 2022. It included various internal upgrades to the arena such as new HVAC units, and the possibility of an outdoor space for entertainment similar to others found at NBA arenas. The biggest addition would be a separate new practice facility located across the street from the arena. In addition, the cost would also cover upgrades to the existing transit station where the new facility would be.
City leaders approved the renovations, now priced at $275 million, in June 2022. Construction is expected to start in summer 2022 with a rough completion date in 2027.
Did You Know?
- The arena hosted the first ever 16–1 upset in the NCAA Tournament since the 64-team field was adopted, when UMBC defeated Virginia 74–54 on March 16, 2018.
- The Spectrum Center's original center-hung scoreboard was the largest in any NBA arena when it debuted and featured a one-of-a-kind light-up 360 degree 3D mural of the Charlotte skyline.
More in Broad Street Culture & Identity
Elsewhere in Philadelphia Flyers
Spotted an error? Know more?
Reader corrections go straight into our review queue. Suggest an edit · How this site is sourced