Unmanned Aerial Vehicles by Country, Part 5 Codexery

USAF Hunter-Killer

A U.S. Air Force tactical UCAV procurement program for endurance and strike.

Last updated

The USAF Hunter-Killer was a tactical unmanned combat air vehicle (UCAV) procurement program initiated by the U.S. Air Force. It sought a less expensive, endurance-focused UCAV solution and attracted proposals from multiple aerospace companies. The program's name derived from an unofficial project designation based on an Aviation Week & Space Technology article, and the term 'Hunter-Killer' had earlier appeared in the 1984 film The Terminator to describe autonomous, twin-ducted fan UAS.

Quick Facts

Operating altitude
10.7 to 15.25 km / 9.48 mi
Endurance
16 to 30 hours or more
Warload
1,360 kg (six 225 kg (496 lb) guided bombs)
Sensors
SAR/MTI or EO/IR sensors and laser target designator
Cost per aircraft
US$10 million
Cost per system
US$30 million (two aircraft and support gear)
Fielding target
2007

Facts from the source article.

Background

The Hunter-Killer program was opened in the summer of 2004 as a short-term UCAV solution emphasizing endurance over stealth. Specifications required an operating altitude of 10.7 to 15.25 km, endurance of 16 to 30 hours or more carrying a warload of 1,360 kg (specifically six 225 kg guided bombs), and fitment of SAR/MTI or EO/IR sensors with a laser target designator. The aircraft would be capable of surveillance or reconnaissance missions alongside its combat role. Cost targets were set at US$10 million per aircraft and US$30 million per system, each system including two aircraft and support gear.

Several companies submitted proposals. Northrop Grumman offered two concepts: the Model 395, a militarized version of the Scaled Composites Proteus in pure UAV configuration with a sensor turret and SAR-MTI pod, capable of carrying six 225 kg munitions or a single 2,270 kg bunker buster; and the Model 396, effectively a half-weight Global Hawk with a 10.7 m wingspan, 7 m length, and 6,800 kg gross weight, powered by a single Pratt & Whitney 545 bizjet turbofan. General Atomics offered the turboprop-powered Predator B. Aurora Flight Sciences and Israel Aircraft Industries jointly offered an armed Heron II.

Lockheed Martin responded but kept details quiet. Boeing did not submit a proposal, citing other UCAW work. Raytheon proposed a sixth option: a package of sensors, communications, and mission systems, with the airframe to be chosen later.

The Air Force intended to field the Hunter-Killer by 2007 and might order up to 60 machines. The program aimed to avoid 'gold plate', with most avionics likely off-the-shelf. Ultimately, the General Atomics MQ-9 Reaper, a variant of the MQ-1 Predator, won the project and was deployed in Afghanistan.

Frequently Asked Questions

What exactly was the USAF Hunter-Killer?

The Hunter-Killer was not a single delivered airframe but a U.S. Air Force procurement initiative seeking a cost-effective, long-endurance unmanned combat air vehicle for tactical strike and surveillance. Multiple aerospace firms submitted proposals, and the program was framed as a far cheaper alternative to manned fighters for persistent combat missions.

What were the Hunter-Killer's key operating specifications?

The program called for an aircraft flying between roughly 10.7 and 15.25 km, sustaining 16 to 30-plus hours aloft, and carrying up to six 225 kg guided munitions for a total warload of about 1,360 kg. Sensor fit included SAR/MTI or EO/IR packages paired with a laser target designator.

How much did the Hunter-Killer program cost?

The target price was roughly US$10 million per airframe and about US$30 million for a complete two-ship system including ground support equipment. That pricing was a central selling point, positioning the UCAV as a dramatically cheaper option than manned tactical aircraft for the same mission set.

More in Unmanned Aerial Vehicles by Country

Sources

Compiled from Wikipedia and the sources listed below. Text from Wikipedia is available under CC BY-SA 4.0; this entry is adapted from it.

Spotted an error? Know more?

Reader corrections go straight into our review queue. Suggest an edit · How this site is sourced

Comments

Loading…
Open in the interactive codex →