Project Vixen
Royal Navy programme for fixed-wing UAVs from Queen Elizabeth-class carriers.
Last updated
Project Vixen is a Royal Navy programme examining the use of fixed-wing unmanned aerial vehicles (UAVs) from the Queen Elizabeth-class aircraft carriers. The project likely draws its name from the de Havilland Sea Vixen and is part of the navy's wider Future Maritime Aviation Force (FMAF) strategy to increase the use of uncrewed systems.
Quick Facts
- Revealed
- 24 March 2021
- Parent strategy
- Future Maritime Aviation Force (FMAF)
- Carrier class
- Queen Elizabeth-class
- Aew replacement target
- Merlin HM2 Crowsnest by 2030
- First carrier launch
- September 2021 (Qinetiq Banshee Jet 80+)
Facts from the source article.
Background
The Royal Navy operates two Queen Elizabeth-class aircraft carriers in a short take-off and vertical landing (STOVL) configuration, limiting them to STOVL aircraft such as the F-35B Lightning II, tiltrotors, or helicopters. This has restricted options for air-to-air refuelling, carrier on-board delivery, and airborne early warning missions, which are better suited to heavier CATOBAR aircraft.
Fixed-wing UAVs, being lighter, have been considered for these roles. In 2012, Defence Minister Philip Dunne stated that the Royal Navy expected to use UAVs from the Queen Elizabeth-class during their 50-year lifespans, and in 2016, Defence Minister Earl Howe described them as an 'operational advantage', noting that the carriers had extensive flight decks, hangars, and engineering support facilities. The Royal Navy evaluated capability concept demonstrators with Joint Forces Command in 2015, and in January 2021 it was reported that the navy was seeking a heavy lift UAV for logistics.
Overview
Project Vixen was first revealed on 24 March 2021, examining UAV use in strike and air-to-air refuelling missions. Under Project Ark Royal, the Royal Navy plans to install catapults and arrestor equipment on both carriers.
In March 2021, the MOD issued a Request For Information for electromagnetic catapults and arrestor cables capable of launching and recovering aircraft with maximum weights of 24,948 kg and 21,319 kg respectively, with installation within three to five years. The system is considered somewhat underpowered for manned fighters like the F-35C, making it more likely for UAVs. The Royal Navy's Future Maritime Aviation Force publication from December 2020 states the aim to replace the Merlin HM2 Crowsnest helicopter-based AEW platform with a fixed-wing UAV, named Vixen, by 2030, also for surveillance, air-to-air refuelling, electronic warfare, and strike roles.
Potential designs
In September 2021, the Royal Navy launched a fixed-wing UAV from an aircraft carrier for the first time, using a Qinetiq Banshee Jet 80+ launched via catapult and recovered by parachute under Project Vampire. The W Autonomous Systems UAV and General Atomics Mojave were trialed in September and November 2023 respectively. Potential designs for Vixen included the Spirit Mosquito from the RAF's LANCA programme, but Project Mosquito was cancelled in June 2022. Royal Navy briefings have used the MQ-28 Ghost Bat adapted with a tail hook as a representation, and in July 2024 General Atomics proposed its Gambit 5 UCAV.
More in Unmanned Aerial Vehicles by Country
Sources
Compiled from Wikipedia and the sources listed below. Text from Wikipedia is available under CC BY-SA 4.0; this entry is adapted from it.
- Wikipedia: Project Vixen (CC BY-SA 4.0).
Spotted an error? Know more?
Reader corrections go straight into our review queue. Suggest an edit · How this site is sourced