Golden 1 Center
Home of the Sacramento Kings, a LEED Platinum arena.
Golden 1 Center is an indoor arena located in downtown Sacramento, California. It occupies part of the former Downtown Plaza shopping center and is part of the Downtown Commons (DoCo) district, which includes a 16-story mixed-use tower that cost $250 million. The publicly owned venue replaced ARCO Arena as the home of the NBA’s Sacramento Kings and also hosts concerts, conventions, and other sports and entertainment events. Its capacity can expand to roughly 19,000 for concerts. There are 34 luxury suites sold for year-round events, with suite holders gaining access to three exclusive clubs on the premium level, including two skyboxes overlooking the concourse with direct outdoor views. Additionally, 48 loft-style suites are available.
The arena was built after an ownership group led by Vivek Ranadivé bought a majority stake in the Kings from the Maloof family, with the city agreeing to partner on a new arena by 2016. Construction began on October 29, 2014, with Turner Construction—known locally for building Terminal B at Sacramento International Airport—serving as construction manager. The Maloof family had first proposed a downtown arena in 2012, with an estimated cost of $391 million, of which the city would have paid $255.5 million, the Kings $73.25 million, and AEG $58.75 million. The street leading to the arena’s entrance was named in honor of former NBA Commissioner David Stern, whose efforts helped keep the franchise in Sacramento; the official address is 500 David J. Stern Walk. The arena’s first concert was a two-night stand by Paul McCartney on his One on One tour, starting October 4, 2016.
The Sacramento City Council approved public financing and other terms on May 20, 2014. The total cost was initially estimated at $507 million, with the Kings contributing roughly $284 million and the city about $223 million. The city financed its share through bond sales ($212 million) and parking and economic development funds ($11 million). Construction costs later rose to $534.6 million due to a seating configuration change that moved hundreds of seats closer to the court and added other features.
The arena’s design reflects Northern California by using regionally sourced materials, including glass, recycled aluminum, and precast concrete made with sand from San Benito and Sierra limestone. All wood used is FSC-certified.
Quick Facts
- Nickname
- G1C / The G1
- Location
- Sacramento, California, U.S.
- Groundbreaking
- October 29, 2014
- Opened
- September 30, 2016
- Owner
- City of Sacramento
- Operator
- Sacramento Kings LP, LLC
- Architect
- AECOM / Mark Dziewulski Architect
- Project Manager
- ICON Venue Group
- Structural Engineer
- Thornton Tomasetti/Buehler & Buehler / Geocon Consultants, Inc. (geotechnical engineer)
- Services Engineer
- Henderson Engineers, Inc.
- General Contractor
- Turner Construction
- Dimensions
- 779200 sqft
Facts from the source article.
Lore & Background
As part of the successful effort to keep the Kings in Sacramento, an ownership group led by Vivek Ranadivé purchased the majority stake in the team from the Maloof family, with the city agreeing to partner with the Kings to build a new arena by 2016. Construction began October 29, 2014, with Turner Construction as the construction manager. The Kings decided to name the street leading to the front door in honor of former NBA Commissioner David Stern, whose efforts helped keep the franchise in Sacramento; the official address is 500 David J. Stern Walk. The arena's first concert was held on October 4, 2016, with Paul McCartney on his One on One tour.
Reader's Guide
Golden 1 Center represents a pivotal development in Sacramento's urban landscape, serving as the anchor of the Downtown Commons district and securing the long-term presence of the Sacramento Kings. Its construction resolved a years-long effort to keep the NBA franchise in the city, involving a public-private partnership between the city and the Kings ownership. The arena is notable for its technological features, including a massive 84-foot videoboard, 100-gigabit internet circuits, and free Wi-Fi 17,000 times faster than the average home network. It earned LEED Platinum certification in September 2016, with a rooftop solar array and an 11 megawatt solar field. The arena has hosted major events including WWE pay-per-views, UFC fights, NCAA basketball tournament rounds, and the winter 2020 legislative session of the California State Legislature during the COVID-19 pandemic. A fan tradition begun in 2022, 'Light the Beam,' involves lighting purple laser beams after Kings victories.
Did You Know?
- The arena's address is 500 David J. Stern Walk, named after former NBA Commissioner David Stern.
- The main videoboard is 84 feet long, 10 feet shorter than the basketball court below, and is the second largest screens in the NBA.
- A rooftop platform with light pipes can be programmed by local artists to convey events through light shows.
- The arena earned LEED Platinum certification in late September 2016.